San Francisco County

EV charger installation in San Francisco, California

San Francisco is roughly 45 minutes from Fremont depending on the bridge, and it is the most constrained environment we work in. Parking is the problem before electricity is the problem.

Get your San Francisco quote

San Francisco housing and electrical panels

Most San Francisco properties have no driveway. Charging happens in a tuck-under garage, a shared building garage, or not at all. Tuck-unders are often straightforward since the panel is frequently in the same garage. Shared buildings are where it gets involved: you are dealing with a house meter, an HOA, and sometimes a garage that is not legally assigned to specific units.

What we see locally

Almost every multi-unit project here turns on two questions before any electrical work is scoped — who owns the parking space, and which meter the charging draws from. We have done enough of these to help structure it, but expect the building governance to take longer than the installation. Buildings in Mission Bay, SoMa and Dogpatch built after 2015 are often EV-ready by code and go quickly.

Permits and inspection in San Francisco

Permits go through the San Francisco Department of Building Inspection. SF has the most involved permitting of any city we serve, and buildings in historic districts or with any facade impact can require extra review. We plan for it rather than discovering it.

What we install in San Francisco

All three of our units are available here, and the right one depends on how long the vehicles sit parked rather than on the property type:

  • AX-Home 40 — 9.6 kW Level 2 for houses and townhouses. Roughly 30 miles of range per hour, which fills any commuter EV overnight. $1,400–$3,200 installed.
  • AX-Fleet 80 — dual-port 19.2 kW for workplaces, apartment parking and light fleet depots, with load sharing and per-driver billing.
  • AX-Rapid 180 — 180 kW DC fast charging for retail and public sites, with CCS1 and NACS cables. Quoted per site; utility timelines dominate the schedule.

Areas of San Francisco we cover

We work throughout San Francisco, including Noe Valley, Sunset, Richmond, Mission Bay, Dogpatch, Bernal Heights, Potrero Hill and SoMa.

Rebates: San Francisco is in PG&E territory, so utility make-ready programmes may apply to commercial and multifamily projects. Note that the federal 30C tax credit expired on 30 June 2026 — see our current incentives page for what is genuinely still available.

Get a fixed price for your San Francisco install

Send a photo of your panel and where you park. We will come back with a real number, and tell you honestly if there is a cheaper way to get what you need.